This is ODNR’s response to our public request regarding the frack waste processing permitted before any regulations were in place.
4K Martins Ferry Facility
Belden Brick Facility
Cowgill Impoundment
Submittal:
Potential Impoundment Revised Site 1 – Eco Resources
Wetland delineation report Noble Impoundments 1 and 4
CPA Big Run Pond Leak Detection & Monitoring System Overview
Pillar Innovations Ohio Approval Quote & Specs
MEI Systems – Security Cameras
Roadway Use and Maintnance Agreement
Dow Cameron Oil and Gas Facility
EnerGreen 360
Enviro Clean Facility
Enviro Tank Facility
Goff Storage Facility
Green Hunter Water Facility
Halliburton Liquid Mud Plant (Zanesville)
Hanchin Recycling Facility
Application to Operate a Facility
Recycling Facility Process Description
Chesapeake_Fixed_Hanchin_12-4-2013 ver6
Iron Eagle Sherrodsville Facility
1. Application to Operate a Facility
1.1 Mike McKenzie Proof of appointment
5.1 Traffic Monitoring Templates
5.2 Chemical Testing Templates
Letter of Transmittal: ODNR Application Submission – 12-20-2013
IWC Ground Tech. Facility
Solidification Media:
Portland_Limestone_Cement MSDS
Liquid Waste Solidification Center
ODNR Application Modification (03-16-14)
Miley Well Pad Facility
Request for Chiefs Order to Operate
NuGlobal Water Treatment Facility
Riverside Park Recycling Facility
Chief’s Order Application:
5 – Facility Plans
BB SWD -Riverside -10-15-13 -pg1-6
BB Riverside Park Recycling Facility Rendering -labels
7 – Roadway Plans
Buckeye-SWD-RIVERSIDE-10-15-13_-_Sheet_3
8 – Stormwater
BUCKEYE BRINE – Uhrichsville SWPPP
Buckeye-SWD-RIVERSIDE-10-15-13_-_Sheet_3
9 – Erosion and Sediment Control
10 – Process
11 – Secondary Containment
Buckeye-SWD-RIVERSIDE-10-15-13_-_Sheet_1
Buckeye-SWD-RIVERSIDE-10-15-13_-_Sheet_2
Buckeye-SWD-RIVERSIDE-10-15-13_-_Sheet_3
Buckeye-SWD-RIVERSIDE-10-15-13_-_Sheet_4
Buckeye-SWD-RIVERSIDE-10-15-13_-_Sheet_5
Buckeye-SWD-RIVERSIDE-10-15-13_-_Sheet_6
13 – Materials Documentation
-0- Methods of documenting volumes
-D- Solids Shipping log sample
14 – Environmental Site Assessment
132-755 Eckenrode Complete Phase I ESA part 1
132-755 Eckenrode Complete Phase I ESA part 2
111-835 Uhrichsville Complete Phase I ESA 11-18-2011
R – 131-300 PFM Geotechechnical Evaluation
15 – Containment
Recycled Water Tank Contaiment
Buckeye-SWD-RIVERSIDE-10-15-13_-_Sheet_1
Buckeye-SWD-RIVERSIDE-10-15-13_-_Sheet_2
Buckeye-SWD-RIVERSIDE-10-15-13_-_Sheet_3
Buckeye-SWD-RIVERSIDE-10-15-13_-_Sheet_4
Buckeye-SWD-RIVERSIDE-10-15-13_-_Sheet_5
Buckeye-SWD-RIVERSIDE-10-15-13_-_Sheet_6
16 – Nuisance Control and Implementation Plan
Nuisance Odor Calculations for Coshocton
17 – Site Safety and Emergency Coordination Plan
18 – Radiation Protection Plan
19 – Closure and Reclamation Plan
Somerset Beneficial Reuse Facility
Mud Dewatering System Description
Water Treatment System Description
Water Treatment System Diagram
Warren Drilling Facility
Brine Storage Application Attachment
Such useful and informative list indeed.